Mortlake Battery Energy Storage System (BESS)

Projects

Mortlake Battery Energy Storage System (BESS)

PROJECT: Mortlake Battery Energy Storage System (BESS)

CLIENT: AusNet

LOCATION: Victoria

YEAR(S): 2024-2026

SCOPE: To design, manufacture and deliver 500kV Arteche Capacitive Voltage Transformers with integrated Power Quality Monitors, 500kV Current Transformers with Marshalling Boxes & Steel Support Structures

BACKGROUND: 

Origin Energy’s Mortlake Battery Energy Storage System (BESS) is a 300MW/650MH/H renewable infrastructure project located adjacent to the Mortlake Power Station in Victoria’s Moyne Shire. It plays a pivotal role in Victoria’s South-West Renewable Energy Zone (REZ), enabling greater integration of wind and solar energy into the National Electricity Market.

AusNet’s scope includes the construction of critical transmission infrastructure: a 500kV switchyard extension, new transformer compound, and harmonic filter system. To support this, GFF Power/Arteche were contracted to supply 500kV Current Transformers (CTs) and 500kV Capacitive Voltage Transformers (CVTs) with PQ sensors, along with marshalling boxes and support structures.

SERVICES PROVIDED:

  • Design, manufacture and supply of Arteche capacitive voltage transformers with integrated power quality monitors, current transformers with marshalling boxes and steel support structures.
  • Ongoing project management, including provision of regular updates relating to anticipated delivery timeline.
  • Complete logistical assistance covering international freight, port clearance and delivery to site, including unloading.
  • Technical support as required by AusNet throughout the project.

OUTCOMES:
All equipment was manufactured to AusNet’s specifications, produced in-line with the agreed schedule, and safely delivered to site per the project required timelines.